Set up a public-works project
What it is for
The system then checks every hour is paid at least the prevailing wage (the legal minimum on public jobs).
Steps
- Step 1: Open "Public works", choose the project and press "Mark it".
- Step 2: Under "Wage determinations", press "Add a determination" and copy the rates from the contract.
- Step 3: Under "Crew classifications", give each worker a classification and press "Save the classification".
- Step 4: For an apprentice, tick "Apprentice" and type the level and the "Registration no.".
✓ Done when: The crew list shows each worker with a classification, and nothing is left under "Hours that need a classification".
Common mistakes
- "Fringe parts must add up": health, vacation, pension, training and other must equal the fringe total.
- An apprentice without a registration number is paid as a journeyworker until you add it.